Sale!

Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope For Medium Large Big Dog

Original price was: $29.97.Current price is: $23.97.

BlackBlueRed
150cm
Clear
SKU: 32907053131 Category:

Description

Name: Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope

Suit For: Medium Large Big Dog

Size: 150cm

Feature: Durable/Heavy Duty

  • SAFETY FOR YOUR DOG
  • STRONGER THAN THE REST: Our leash is made of the STRONGEST ROPE
  • GREAT FOR TRAINING, WALKING OR RUNNING

Additional information

Brand Name

Beirui

Dog Leash Type

Basic Leashes

Pattern

Solid

Material

NYLON

Season

All seasons

Type

Dogs

Remaining Shelf Life

>6 months

Applicable Dog Breed

Large Medium-sized Dog

Model Number

YWL065

Color

Red/Black/Blue

Feature

Durable/Heavy Duty

Length

150cm

Reviews

There are no reviews yet.

Be the first to review “Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope For Medium Large Big Dog”

Your email address will not be published. Required fields are marked *