Sale!

Long Leash for Dogs Durable Dog Tracking Leash Long Leads Rope Pet Training Walking Leashes for Puppy Medium Large Dogs

$15.92$19.56

2.0cm2.5cm
1.5m Bule1.5m Red2m Bule2m Red
Clear
SKU: 33018786343 Category:

Description



  • Canvas durable thickening long traction rope pet medium dog large dog
  • Double the quality
  • Width: 2.0cm, 2.5cm
  • Length: 1.5 meters, 2 meters
  • Color: red, blue

Additional information

Brand Name

fanchicefanst

Dog Leash Type

Basic Leashes

Season

All seasons

Pattern

Solid

Product Name

Match grade canvas easy to pull Leash

Pet Products

Dog Leash

Suit

Small Dogs/Medium Dogs/ Large Dogs

Color

Blue red

Length

1.5m/2m long Leash

Material

canvas

Support Drop Shipping

Yes

Feature

Durable

Type

Classic Style

Pet runnig leash

Pet leash sports/travel/Mountaineering/outdoor

Integrated traction rope

One traction rope

Reviews

There are no reviews yet.

Be the first to review “Long Leash for Dogs Durable Dog Tracking Leash Long Leads Rope Pet Training Walking Leashes for Puppy Medium Large Dogs”

Your email address will not be published. Required fields are marked *